Paddock construction with TERRA-GRID E 35

This paddock was built on the slope with our TERRA-GRID E 35 and substructure. Exactly according to our building recommendation, in the classic three-layer method support layer separation layer with paddock plates TERRA-GRID E 35, pedal layer with washed natural sand.